Root Cause Analysis Using Fishbone Diagram: Company Management Decision Making
DOI:
https://doi.org/10.54408/jabter.v1i6.103Keywords:
RCA, Fishbone Diagram, Management Information System, Decision Making, 4MAbstract
This study aims to analyze the causes of delays in decision-making within the company. Managers can identify several constraints in decision-making by using analytical tools. In this study, the device used to analyze the problem is root cause analysis. Root cause analysis is used to determine the initial cause of the issues. The method used in the root cause analysis is a fishbone diagram where the fishbone diagram can identify some of the problems that underlie the constraints in decision making. This study uses a qualitative descriptive method by taking data from interviews and documentation. The results of this study can be seen in decision making four problems underlie the inhibition of decision making. The problem is the first decision-maker; namely, the company's management is not wholly a determinant in making decisions. The second problem is that the information presented as a guide for decision-making is inaccurate, not timely, and irrelevant. The third problem is the absence of software that processes data into information needed by company management. The last problem is the lack of integration between divisions, so the resulting information is out of sync. Root cause analysis and fishbone diagrams, that was possible to analyze in detail the causes of delays in decision making. In the end, management can find solutions to each of these problems. Management will search each problem for the root cause, and the answer that they will give will be right on target so that the hope to minimize the obstacles to decision making will be implemented.
Downloads
References
Eviyanti, N. (2021). Analisis Fishbone Diagram Untuk Mengevaluasi Pembuatan Peralatan Aluminium Studi Kasus Pada Sp Aluminium Yogyakarta. JAAKFE UNTAN (Jurnal Audit Dan Akuntansi Fakultas Ekonomi Universitas Tanjungpura), 10(1), 10. https://doi.org/10.26418/jaakfe.v10i1.45233
Gozali, L., Daywin, F. Y., & Doaly, C. O. (2020). Root Cause Analysis and Overall Equipment Effectiveness of Press Machine in Line H and Hirac At Pt. Xyz. Jurnal Muara Sains, Teknologi, Kedokteran Dan Ilmu Kesehatan, 4(2), 285. https://doi.org/10.24912/jmstkik.v4i2.8735
Groot, W. (2021). Root cause analysis – what do we know? Maandblad Voor Accountancy En Bedrijfseconomie, 95(1/2), 87–93. https://doi.org/10.5117/mab.95.60778
Handayani, W., & Susilowati, N. (2021). Analisis Pengukuran Produktivitas di Bagian Pengecoran PT Apie Indo Karunia. 6, 1–13.
Hisprastin, Y., & Musfiroh, I. (2020). Ishikawa Diagram dan Failure Mode Effect Analysis (FMEA) sebagai Metode yang Sering Digunakan dalam Manajemen Risiko Mutu di Industri. Majalah Farmasetika, 6(1), 1. https://doi.org/10.24198/mfarmasetika.v6i1.27106
Kumbhar, K. N. (2018). Brainstorming technique: Innovative Quality Management Tool for Library. Current Trends in Library Management, June, 1–8.
Liliana, L. (2016). A new model of Ishikawa diagram for quality assessment. IOP Conference Series: Materials Science and Engineering, 161(1). https://doi.org/10.1088/1757-899X/161/1/012099
Magar, V. M., & Shinde, V. B. (2014). Application of 7 Quality Control ( 7 QC ) Tools for Continuous Improvement of Manufacturing Processes. International Journal of Engineering Research and General Science, 2(4), 364–371.
Mario Coccia. (2017). The Fishbone diagram to identify, systematize and analyze the sources of general-purpose technologies. The Fishbone Diagram to Identify, Systematize and Analyze the Sources of General Purpose Technologies, 4(4), 291–303. https://doi.org/10.1453/jsas.v4i4.1518
Mega Astuti DR, Uwes Anis Chaeruman, & Mulyadi. (2019). Penerapan Root Cause Analysis pada Penurunan Kinerja Karyawan. Jurnal Pembelajaran Inovatif, 2(2), 133–143. https://doi.org/10.21009/jpi.022.07
Pebrianti, S. A., Kusumah, H., & Yunita, N. (2021). Identifikasi Permasalahan Kualitas Garam Industri Di Pt Niaga Garam Cemerlang Menggunakan Check Sheet, Pareto Chart Dan Fishbone Analysis. 2(3), 2746–1209.
Rana, S., & Belokar, R. M. (2017). Quality Improvement Using FMEA: A Short Review. International Research Journal of Engineering and Technology, 4(6), 263–267. https://irjet.net/archives/V4/i6/IRJET-V4I645.pdf
Saori, S., Anjelia, S., Melati, R., Nuralamsyah, M., Djorghi, E. R. S., & Ulhaq, A. (2020). Analisis Pengendalian Mutu Pada Industri Lilin (Studi kasus Pada PD.Ikram Nusa Persada Kota Sukabumi). Jurnal Inovasi Penelitian, 1(3), 266–267.
Sarkar, M. L. (2018). Pareto Analysis of the Engineering-Related Quality Issues of Rural Electrification Projects. 6(3), 56–64.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Siti Holifahtus Sakdiyah, Nurafni Eltivia, Aang Afandi
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
This journal is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.